Project
The original Swiss chalet required extending and a fully replaced traditional roof which included timber structure, roof stones, insulation, vapour barriers & copper work. Phase 2 work currently under way to extend the chalet after ATTOL obtained planning permission from the local canton.
![Image grid item 1](http://www.attol.co.uk/wp-content/uploads/2023/01/finished-roof.jpg)
![Image grid item 2](http://www.attol.co.uk/wp-content/uploads/2023/01/photo-1a_copy1.jpg)